Start with the proposed route and automatic terrain, or import supported CAD survey topography. Set entry and exit, cover, setback and critical points. Edit the top-down route, then move between 2D and full rotational 3D viewing. Turn the drill shot and topo profile to inspect the geometry from different angles.
The rod-by-rod planner makes that geometry tangible. Inspect individual rods, review pitch and cover, and develop a pre-bore plan that the field crew can work through. Your equipment and fitted rods give the design its operating context.
01 / EQUIPMENTYour rig. Your rods.
Set up the selected machine and fitted rods. Keep the plan independent of drill-rig brand, with equipment details appropriate to the job.
02 / GEOMETRYEvery bend has a context.
Review drill-pipe and product-pipe bend requirements, including lateral and compound bends. Identify where the route pushes selected limits.
03 / CROSSINGSSee what sits around it.
Bring roads, rail, rivers and utilities into the picture. Review crossing dimensions, clearance and the nominal final reamed-bore envelope.
04 / HANDOVERA plan the crew can follow.
Carry the design into a rod schedule and pre-bore report. Transfer the bore file into Dynamic Steer for local field use.